Abstract

This study identifies 35 risks related to the supply chain of concrete dams, of which 25 were selected as critical risks using the Delphi method. Risks were categorized into three groups based on their sources including environmental, network and organizational risks. The Failure Mode and Effect Analysis (FMEA) method was then applied to evaluate the significance of risks in three areas of construction cost, time and quality. The results revealed that 44% of risks in the construction cost category were critical, while 21% of risks in construction time and 12% in construction quality were found to be critical. Appropriate responses to mitigate critical risks were provided, including the use of alternative supply resources, rigorous project scheduling, and diversified financial strategies. This study highlights the importance of risk management in improving project performance in terms of cost, time, and quality, and emphasizes the need for effective communication and continuous risk monitoring throughout the project lifecycle.

Keywords

Main Subjects


[1] Wong A (1999). Total quality management in the construction the construction industry in Hong Kong: A supply chain management perspective. Total Quality Management, 199-208.
[2] Lavastre O, Gunasekaran A, Spalanzani A (2012). Supply chain risk management in French companies. Decision Support Systems, 828-838.
[3] Abidin NAZ, Ingirige B (2018). Identification of the “Pathogenic” Effects of Disruptions to Supply. Procedia Engineering, 467-474.
[4] Jüttner U (2005). Supply chain risk management. International Journal of Logistics Management, 120-141.
[5] Vrijhoef R, Koskela L (2000). The four roles of supply chain management in construction. European Journal of Purchasing & Supply Management, 169-178.
[6] Dallasega P, Rauch E, Linder C (2018). Industry 4.0 as an enabler of proximity for construction supply chains: A systematic literature review. Computers in Industry, 205-225.
[7] Xue X, Wang Y, Shen Q, Yu X (2007). Coordination mechanisms for construction supply chain management in the Internet environment. International Journal of Project Management, 150-157.
[8] Halil FM, Mohammed MF, Mahbub R, Shukur AS (2016). Trust Attributes to Supply Chain Partnering in Industrialised Building System. Procedia - Social and Behavioral Sciences, 46-55.
[9] Ansar A, Flyvbjerg B, Budzier A, Lunn D (2014). Should we build more large dams? The actual costs of hydropower megaproject development. Energy Policy, 43-56.
[10] Chen ZS, Zhou J, Zhu CY, Wang ZJ, Xiong SH, Rodríguez RM, Martínez L, Skibniewski MJ (2023). Prioritizing real estate enterprises based on credit risk assessment: an integrated multi-criteria group decision support framework. Financial Innovation, 9, 120.
[11] Wang ZJ, Sun Y, Deveci M (2024). Smart Contract Application in Resisting Extreme Weather Risks for the Prefabricated Construction Supply Chain: Prototype Exploration and Assessment. Group Decision and Negotiation, 1049-1087.
[12] Taleb NN (2007). The Black Swan: The Impact of the Highly Improbable. Random House.
[13] Chanson H (2009). Embankment overtopping protections system and earth dam spillways. In W.P. Hayes, Dams: Impacts, Stability and Design pp. 101-132. NY: Nova Science Publishers.
[14] Johnson ME (2001). Learning From Toys: Lessons in Managing Supply Chain Risk from the Toy Industry. California Management Review Reprint Series, 106-124.
[15] Qaraqanabadi F, Sarkardeh H (2024). Identification and evaluation of supply chain risks in road construction projects. Structural and Construction Engineering (In Persian)
[16] Wilson MC (2007). The impact of transportation disruptions on supply chain performance. Transportation Research Part E, 295-320.
[17] Gaudenzi B, Borghesi A (2006). Managing risks in the supply chain using the AHP method. International Journal of Logistics Management, 114-136.
[18] Tuncel G, Alpan G (2010). Risk assessment and management for supply chain networks: A case study. Computers in Industry, 250-259.
[19]. Giri BC, Bardhan S (2015). Coordinating a supply chain under uncertain demand and random yield in presence of supply disruption. International Journal of Production Research, 5070-5084.
[20] Yang Y, Xu X (2015). Post-disaster grain supply chain resilience with government aid. Transportation Research Part E, 139-159
[21] Nasser Alamri, O. A. (2017). Analysis Of Construction Delay Causes In Dams Project In Oman. European Journal of Business and Social Sciences, 19 - 42.
[22] Blloku M, A. Ö. (2013). A case study of the delays of dam and channels construction in Albania. International Balkans Conference on Challenges of Civil Engineering, pp.23-25. Tirana.
[23] Marietjir R. De Villiers, P. J. (2005). The Delphi technique in health sciences education research. Medical Teacher, 639-643.
[24] Sinead Keeney, F. H. (2001). A critical review of the Delphi technique as a research methodology for nursing. International Journal of Nursing Studies, 195-200.
[25] Paul R. Kleindorfer, G. H. (2005). Managing Disruption Risks in Supply Chains. Production and Operations Management, 53-68.
[26] Uta Jüttner, H. P. (2003). Supply chain risk management: outlining an agenda for future research. International Journal of Logistics Research and Applications, 197-210.
[27] Stamatis DH (2003). Failure Mode and Effect Analysis: FMEA from Theory to Execution. ASQ Quality Press.
[28] Kudláč S, V. Š. (2017). Using the Saaty Method and the FMEA Method for Evaluation of Constraints in Logistics Chain. Procedia Engineering, 749-755.
[29] Ebrahemzadih M, G. H. (2014). Assessment and Risk Management of Potential Hazards by Failure Modes and Effect Analysis (FMEA) Method in Yazd Steel Complex. Open Journal of Safety Science and Technology, 127-135.